{"id":2317,"date":"2026-04-15T14:25:29","date_gmt":"2026-04-15T14:25:29","guid":{"rendered":"https:\/\/liid.mgsi.gov.rs\/%d0%b7%d0%b0%d0%b2%d1%80%d1%88%d0%b5%d0%bd%d0%b8-%d1%80%d0%b0%d0%b4%d0%be%d0%b2%d0%b8-%d0%bd%d0%b0-%d0%b1%d0%b8%d1%86%d0%b8%d0%ba%d0%bb%d0%b8%d1%81%d1%82%d0%b8%d1%87%d0%ba%d0%b8%d0%bc-%d0%b8-%d0%bf\/"},"modified":"2026-04-15T14:29:03","modified_gmt":"2026-04-15T14:29:03","slug":"completed-works-on-cycling-and-pedestrian-pathways-in-sombor","status":"publish","type":"post","link":"https:\/\/liid.mgsi.gov.rs\/en\/completed-works-on-cycling-and-pedestrian-pathways-in-sombor\/","title":{"rendered":"COMPLETED WORKS ON CYCLING AND PEDESTRIAN PATHWAYS IN SOMBOR"},"content":{"rendered":"\n<p>Within the framework of the LIID Project, works on the construction of cycling infrastructure along XII Vojvo\u0111anske Udarne Brigade Street and Staparski Road in Sombor have been successfully completed.<\/p>\n\n\n\n<p>The implementation of these projects has improved conditions for both pedestrians and cyclists through the construction of new pathways and the reconstruction of existing ones, as well as their clear separation from motorized traffic. A combined pedestrian and cycling path was developed along Staparski Road, while a dedicated cycling lane was constructed along XII Vojvo\u0111anske Udarne Brigade Street.<\/p>\n\n\n\n<p>These projects contribute to improved connectivity between different parts of the city and enhance traffic safety, particularly for non-motorized road users. During the execution of the works, special care was taken to preserve existing green areas and tree lines, as well as to ensure proper stormwater drainage.<\/p>\n\n\n\n<p>With the completion of these projects, the local transport infrastructure has been upgraded, enabling safer and more efficient mobility for citizens.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Within the framework of the LIID Project, works on the construction of cycling infrastructure along XII Vojvo\u0111anske Udarne Brigade Street and Staparski Road in Sombor have been successfully completed. The implementation of these projects has improved conditions for both pedestrians and cyclists through the construction of new pathways and the reconstruction of existing ones, as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2308,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-2317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/posts\/2317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/comments?post=2317"}],"version-history":[{"count":1,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/posts\/2317\/revisions"}],"predecessor-version":[{"id":2320,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/posts\/2317\/revisions\/2320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/media\/2308"}],"wp:attachment":[{"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/media?parent=2317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/categories?post=2317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/liid.mgsi.gov.rs\/en\/wp-json\/wp\/v2\/tags?post=2317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}